Berlin, CT- Complete machining of large valve body flanges and/or weld connections is assured with Special Royal Workholding “C” Frame Fixtures by their clamping on the parts’ bodies and not on the flanges. This unique arrangement reduces overall manufacturing time through lesser handling and concentration of machining operations. Designed and built in the USA by […]
Entries from June 2012
SPECIAL ROYAL WORKHOLDING “C” FRAME FIXTURE REDUCES OVERALL MANUNUFACTURING TIME THROUGH LESSER HANDLING AND CONCENTRATION OF MACHINING OPERATIONS
June 17th, 2012 Comments Off on SPECIAL ROYAL WORKHOLDING “C” FRAME FIXTURE REDUCES OVERALL MANUNUFACTURING TIME THROUGH LESSER HANDLING AND CONCENTRATION OF MACHINING OPERATIONS
Tags: